Company Logo
Gas Turbine Power Plant
Products/Gas Turbine Power Plant/Components Refurbishment/Gas Turbine Stage 2 Shroud Refurbishment
Gas Turbine Stage 2 Shroud Refurbishment

Gas Turbine Stage 2 Shroud Refurbishment

Beijing Jinrun Taihe offer gas turbine stage 2 shroud refurbishment, as well as complete gas turbine refurbishment service, the detail is described as follows.

Description:

Beijing Jinrun Taihe offer gas turbine stage 2 shroud refurbishment, as well as complete gas turbine refurbishment service, the detail is described as follows.


Light gas turbine components refurbishment

Repair and delivery of 281 pieces of products to PetroChina LM2500 and RB211 light gas turbine combustion chambers, compressor rotor blades, high vortex rotor blades, LM2500 combustion chambers, medium vortex rotor and guide blades.


40.5


●Compressor rotor blade

Failure mode: blade tip wear and falling block

Repair methods: laser cladding and adaptive processing

Status: Qualified Delivery


40.6


●High pressure turbine rotor blade

Failure mode: tip wear and crack

Repair method: laser cladding, self-adaptive processing and replacement of Pt-AI coating

Status: Through user identification, batch repair is in progress


40.7


•The factory applies L3667 oxidation resistant welding alloy to high pressure turbine blades.

•LM2500 high pressure turbine, RB211 high pressure turbine-blade life can be extended by 2 times.


Hot Tags: gas turbine stage 2 shroud refurbishment, China, manufacturers, suppliers, factory, customized, buy, cheap, Gas Turbine Stage 3 Nozzle Refurbishment, Gas Turbine Combustion Liner Refurbishment, Gas Turbine Power Plant, Gas Turbine Stage 1 Nozzle Refurbishment, Gas Turbine Stage 2 Shroud Refurbishment, Gas Turbine Stage 2 Nozzle Refurbishment