S u b : Siemens SGT 800 Gas Turbine Generator P ackage We, Beijing Jinrun Taihe, hereby would like make our best offer as follows for following products. SGT-800 Gas Turbine Data and Current Status Detailed maintenance reports will be made available on request by interested buyer Scope of supply The list...
Sub: Siemens SGT 800 Gas Turbine Generator Package
We, Beijing Jinrun Taihe, hereby would like make our best offer as follows for following products.
SGT-800 Gas Turbine Data and Current Status
Unit #1 |
Unit #2 |
|
Gas Turbine |
Siemens Industrial Turbomachinery AB Type: SGT-800 |
Siemens Industrial Turbomachinery AB Type: SGT-800 |
Main Gear |
Flender Graffenstaden Type: TX112/ 4C |
Flender Graffenstaden Type: TX112/ 4C |
Electric Generator |
Siemens Energy Type: SGEN5-100A-4P |
Siemens Energy Type: SGEN5-100A-4P |
Max. Capacity |
47.5 MWe – after upgrade in 2010 |
45 MWe |
Last reported OH |
118,120 EOH |
110,500 EOH |
Last reported maintenance |
A-Inspection at 110,753 EOH |
A-Inspection |
Major repairs |
maintained in accordance with OEM recommendations |
maintained in accordance with OEM recommendations; |
Exchanges |
no additional work outside the normal service range |
no additional work outside the normal service range |
Upgrades |
unit was upgraded to A-Plus as per OEM package |
N/A |
Detailed maintenance reports will be made available on request by interested buyer
Scope of supply
The list below is scope for Siemens SGT800 Gas Turbine Generator Package, which will be provided by seller.
Siemens SGT800 |
||
Item |
Scope of Supply |
Quantity |
1 |
Siemens SGT800 gas turbine generator package: including engine, gearbox, generator, frame and enclosure, as well as fuel system, lubrication system, electric control system, CO2 automatic fire extinguishing system and enclosure lighting, etc. to which the gas turbine generator package belongs. |
2 Sets |
Price
Siemens SGT800 Gas Turbine Generator Package price is as below
Item |
Description |
Scope of supply |
Unit Price (USD) |
QTY (sets) |
Total Price (USD) |
1 |
Siemens SGT800 Gas Turbine Generator Package |
As above |
7,160,000.00 |
2 |
14,320,000.00 |
TOTAL AMOUNT IN USD |
14,320,000.00 |
Delivery time
The products will be dispatched within 2 months after the contract signed and downpayment received.
Payment terms
50% of contract amount shall be paid with 10 days after contract signed and issuing invoice. 50% of contract amount shall be paid after the receipt of the products readiness from Seller.
Quality Warranty
Not available
Price validity
This offer will be validated for 10 days.
Hot Tags: sgt 800 gas turbine generator package, China, manufacturers, suppliers, factory, customized, buy, cheap, Top Gas Recovery Turbine Unit Equipment, Hydro Runner Repair, Power Station Circulating Pump, Top Gas Recovery Turbine Unit Bearing, Power Plant Retrofitting, Gas Turbine Maintenance And Overhaul